Wave 7: collaboration framework hardening (W10.1-W10.4)
Pure agents/ documentation work — first contributions from 4 previously-idle members (yang/li/zhu/xu). - W10.1 yang: WORKFLOW §11-§13 — collaboration state machine (9 states / 16 transitions), 10-item acceptance checklist, 7-scenario failure rollback playbook (+227 lines) - W10.2 li: agents/STATUS.md — live roster + group + Wave progress snapshot (65 lines) - W10.3 zhu: agents/PROMPT_TEMPLATE.md — subagent prompt template with 6 anti-patterns + 1 worked example + 4-step pre-dispatch checklist (193 lines) - W10.4 xu: agents/POSTMORTEM.md — 5 incident records (PM-001 stale-obj, PM-002 boost-json, PM-003 cross-DLL-heap, PM-004 loader-fail-fast, PM-005 push-force) + 7 defensive rules (172 lines) No code changes. WORKFLOW.md §9 has a pointer to the new PROMPT_TEMPLATE.md. STATUS.md updated to reflect W10.1 completion (yang status flipped working→idle). 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
This commit is contained in:
@@ -19,6 +19,9 @@ weaknesses:
|
||||
performance_log:
|
||||
- date: 2026-05-27
|
||||
event: "入职 dstalk 团队"
|
||||
rating: ongoing
|
||||
rating: completed
|
||||
- date: 2026-05-27
|
||||
event: "W10.1: 设计协作状态机 + 验收清单 + 失败回退协议,追加 WORKFLOW.md §11–§13"
|
||||
rating: completed
|
||||
current_groups: []
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user